Removal

1. Drill lateral plugs to a depth of approx.

9 mm using a 4.8 to 5 mm dia. drill and cut in an M 6 thread using a bottoming tap. Pull out plug with an M 6 bolt and a spacer sleeve.

The lock pins used to hold the spray tube in place are factory-fitted in forward direction (pointing towards the flywheel). Refer to explosion drawing, part no. 14.

2. Punch centering pin and drill with a 2.5 mm dia. drill, tap an M 3 thread and use an M 3 bolt and spacing sleeve to pull out pin.

0 0

Post a comment