Bleeding the valve block and the locking line to the lock slave cylinder

• Connect the 9288 system tester

• Switch the ignition "ON"

• Connect the bleed cylinder to the bleed screw on the slave cylinder

• Open the bleed screw on the slave cylinder

• Select "Start PSD Bleeding" and actuate repeatedly until no further air emerges

• The bleeding device must remain switched on, because the reservoir volume is used up rapidly.

• After this, close the bleed screw on the slave cylinder

• Select "Stop Bleeding" and "Start Pressure Reduction" at the system tester

• Switch off the bleeding device and disconnect it

• Screw on the reservoir cover

• Open the vent line at the reservoir again

• Check level in reservoir. The liquid must be approx. 1 cm above the step in the reservoir body (with the pressure reservoir charged)

Was this article helpful?

0 0

Post a comment